Construction Progress Photo's

Week 44 Construction photo

Week 44-6/4/2004
Details, details...there's alot of detail work taking place.  From the outside the major structures are in place and finishing work will continue for some time.  Work on preparing the main entry way to the building has begun. The Masons and all the other Tradesman continue their efforts inside the structure.   6/4/2004 Air 59 Wind W6

Week 45 Construction Photo
Week 45 -6/11/2004
Nice weather lets work progress.  Here we see the entrance stairs, handicap ramps and walking surfaces at the front of the building have been prepared for a concrete pour.  Decorative stonework has been added to the tower.  The facia boards on the upper mezanine roof line are now finished with metal.  Work continues inside and now for the first time a look at the work inside.  This weeks tour depicts a view some of our future customers will see in our Adult Processing Area6/11/2004 Air 61 Wind NW7

Week 46 Construction Photo
Week 46-6/18/2004
Overcast and hazy in this photo but still good weather to work.  Finish materials are being applied to the roof and exterior walls on the upper mezanine.  About half the  roof is done on the upper level.  Not visible in this photo is all the exterior brick that has been applied.  The Masons have gone around the building and now are about half way down the south wall.  This weeks tour takes us through the Juvenile Processing Area6/18/2004 Air 62 Wind N3

Week 47 Construction Photo
Week 47-6/25/2004
The upper mezanine roofing has been completed.  While the upper exterior walls are nearly completed as they are clad with a metal finish material.  Work is beginning on the main roof area.  Staging has been placed on the southeast side (Photo lower left) as the Masons prepare to round the corner and start on the east side of the building.  This weeks tour shows us the Exterior Garage6/27/2004 Air 61 Wind W9