Week 31 Construction photo

Week 31-3/5/2004
Many tradesman are moving onto the work site.  The Masons are busy with the Outbuilding and the Tower now encased in plastic.  The Roofing contractor has moved material on site and preparation work has begun on the upper roof deck. 3/7/04 Air 36 Wind 10

Week 32 Construction Photo
Week 32-3/12/2004
Mild temps let progress blossom.  The Tower is uncovered exposing it's height.  The Masons have put staging and plastic in place along the north wall as work continues on the Outbuilding.  Insulation and roof decking materials are being installed on the upper level.  3/12/04 Air 39 Wind 0

Week 33 Construction Photo
Week 33-3/19/2004
The Masons have been very busy.  The Tower continues to grow taller.  Many walls have been installed on the first level areas of the north, west and south faces of the building.  The Outbuiding is also progressing.  The Roofing installation continues with facia boards visible along both upper and lower roof edges.  3/20/04 Air 30 Wind 1

Week 34 Construction Photo
Week 34-3/26/2004
Block and more block.  Walls are growing everywhere on the site.  Concrete flooring was poured in the booking room area of the building.  There's been alot of progress on the roofing installation which continues to grow.  3/27/04 Air 59 Wind 10