Construction Progress Photo's

Week 14 Construction photo

Week 14-11/7/2003
Foundation work continues throughout the week.  On the left side of the frame an excavator can be seen backfilling the foundation grid.  Meanwhile concrete forms are under construction at the center of the photo.

Week 15 Construction Photo

Week 15-11/14/2003
Foundation wall construction progressing.  There's a lot of exposed concrete showing on the job site now.  Backfilling the foundation grid follows behind the form work.  The Excavator is now inside the foundation grid compared to last weeks photo where it was working outside the south wall.

Week 16 Construction Photo
Week 16-11/19/2003
Still going....Foundation wall construction continues to progress to the north side of the construction site.  Even more concrete is visible now.  Backfilling throughout the grid has taken place.  Work (foundation walls) have been started at the marsh side of the site on the "Outbuilding".

Week 17 Construction Photo
Week 17-11/28/2003
And still going....Foundation wall construction continues to progress to the north side of the construction site.  The Foundation walls have been poured and covered with plastic on the "Outbuilding" on the marsh side of the site.


Home | Employment | CrimeLine | Training | Press | Mounted
©1998-2013 Hampton Police Department, New Hampshire 03842